PROJECT CHALLENGE
Designed around site conditions.
The workshop wanted to reduce waiting between lamination, cutting and collection while maintaining accessible quality inspection.
ENGINEERING RESPONSE
A practical, serviceable configuration.
Conveyor speeds and buffer positions were balanced across the line. Inspection lighting and sample points were added before tiles entered the packing area.
DELIVERY SCOPE
From preparation to handover.
- Line-balancing and buffer plan
- Integrated speed-control logic
- Quality station before packing
- Shift-start and shutdown procedures
This project brief is anonymized to protect commercial information. It describes the engineering approach and does not disclose the customer name or confidential production data.
Get a quotation 