PROJECT CHALLENGE
Designed around site conditions.
The project needed to accommodate several face-film patterns, back foils and adhesive candidates while maintaining a consistent finish.
ENGINEERING RESPONSE
A practical, serviceable configuration.
Tooling and film paths were configured for repeat setup, while acceptance trials used the buyer's nominated board, film and adhesive combinations. Settings were documented by product family.
DELIVERY SCOPE
From preparation to handover.
- Material compatibility trial plan
- Indexed guides for repeat film alignment
- Sample approval before bulk production
- Recipe and changeover documentation
This project brief is anonymized to protect commercial information. It describes the engineering approach and does not disclose the customer name or confidential production data.
Get a quotation 