PROJECT CHALLENGE

Designed around site conditions.

Airborne dust could affect adhesive wetting and leave visible defects under decorative PVC film.

ENGINEERING RESPONSE

A practical, serviceable configuration.

The line concept added board cleaning before coating, protected adhesive preparation and defined housekeeping zones around lamination. Service access was kept open for daily roller cleaning.

DELIVERY SCOPE

From preparation to handover.

  • Board-cleaning stage and inspection lighting
  • Protected adhesive preparation area
  • Daily surface-quality checklist
  • Recommended filtration and housekeeping plan

This project brief is anonymized to protect commercial information. It describes the engineering approach and does not disclose the customer name or confidential production data.