PROJECT CHALLENGE

Designed around site conditions.

Frequent pattern and size changes risked lost production time and inconsistent first-off tiles.

ENGINEERING RESPONSE

A practical, serviceable configuration.

Repeatable guide positions, clearly labeled tooling and stored operating parameters shortened setup. The handover process included a first-piece approval routine before each batch.

DELIVERY SCOPE

From preparation to handover.

  • Changeover checklist and first-piece standard
  • Tool and film storage plan
  • Settings table by board and finish
  • Operator quality checkpoints

This project brief is anonymized to protect commercial information. It describes the engineering approach and does not disclose the customer name or confidential production data.