PROJECT CHALLENGE
Designed around site conditions.
Frequent pattern and size changes risked lost production time and inconsistent first-off tiles.
ENGINEERING RESPONSE
A practical, serviceable configuration.
Repeatable guide positions, clearly labeled tooling and stored operating parameters shortened setup. The handover process included a first-piece approval routine before each batch.
DELIVERY SCOPE
From preparation to handover.
- Changeover checklist and first-piece standard
- Tool and film storage plan
- Settings table by board and finish
- Operator quality checkpoints
This project brief is anonymized to protect commercial information. It describes the engineering approach and does not disclose the customer name or confidential production data.
Get a quotation 